Ongoing project – Raigmore Hospital, Inverness

Date: Friday, May 11th, 2018

2. Completed Wards (2)

MEP works are ongoing on the upgrade of the critical care services at Raigmore Hospital, Inverness.

The upgrade brings all critical care services adjacent to each other over two floors including the Acute Medical Assessment Unit, Intensive Care Unit, Surgical High Dependency Unit, CCU, Cardiology and Theatre Suite.

The theatre suite includes the refurbishment of the operating theatres with an additional theatre bringing the total number of theatres to 10.

 

 

Client: NHS Highland

Main Contractor: Graham Construction

Architect: Oberlanders

Consultant: Cundall

Services: M&E

Duration: 40 months

Location: Inverness

 

Electrical services include:

  • HV Diversions and modifications
  • Switchgear and sub mains cabling
  • UPS and associated power supplies
  • IPS/ UPS Theatre systems
  • General purpose & emergency lighting
  • General Purpose Power
  • Fire Detection & Alarm systems
  • Data Distribution system
  • Nurse Call system
  • Assistance Call Alarm system
  • Induction Loop systems
  • Access control
  • Mechanical wiring
  • Medical earthing (MEIGaN)
  • Lightning Protection & surge protection systems
  • Test & commission

 

Mechanical services include:

  • Heating & Plumbing installation
  • Chilled Water installation
  • AHU installation
  • Air Conditioning installation
  • Medical gas installation
  • Sanitary Ware installation
  • Ventilation
  • BMS Controls
  • Pneumatic tube system
  • Test & commission

 