The Berkeley Hotel, 5th Floor Refurbishment, London

Featured Project 
The Berkeley Hotel, 5th Floor Refurbishment|
Location : London |
Type : Hospitality and Leisure

We have completed the MEP services to the refurbishment of the 5th floor of the Berkeley Hotel located in Knightsbridge, one of London’s most affluent area.

 

The works comprised the refurbishment of 15no. bedrooms, the Grand Pavilion and Crescent Pavilion super suites.

 

Electrical services include:

 

  • Isolations and diversions
  • LV Switchgear and sub mains cabling
  • General purpose & emergency lighting
  • External Lighting
  • lighting controls
  • General Purpose Power
  • Bespoke electrical accessories
  • Video door intercom system
  • Fire Alarm system
  • CCTV System
  • Security Alarm System
  • Structured cabling
  • AV System
  • Mechanical wiring
  • Test & commission

 

Mechanical services include:

 

  • Isolations and diversions
  • Domestic water services
  • Soils and wastes
  • Installation of Sanitary Ware
  • Controls
  • Test & commission

Client: The Maybourne Group

Main Contractor: Rainey & Best

Architect: ASFO / Maybourne Interior Design

Consultant: Aecom

Services: M&E

Duration: 12 months

Value: £900,000

Location: Knightsbridge, London